Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
- Mar 6 deu>eng Schwerwert heavy load value/threshold/high stress value/high critical threshold pro closed no
- May 16 '23 deu>eng mittels Wandeinbau-Block oder -Bohrung eingesetzt werden wall installation via a precast concrete block or drill hole pro closed no
4 Jun 2 '22 deu>eng schwarz schließen close the on load switch pro closed no
4 Oct 22 '20 deu>eng Abzugsprüfung traction testing , pull (and shear) test, pull-off test pro closed ok
- Sep 28 '19 deu>eng Würgenippel cable gland pro closed ok
- Feb 26 '15 deu>eng Werbeeinklinker inset pro closed ok
4 Mar 24 '12 deu>eng Die Pultverkabelungen sind über Bodenerschliessungen gelöst. desk wiring is realised by connecting to a cable shaft (or electrical concuit) in the floor pro closed no
Asked | Open questions | Answered